AUDIO VISUAL


Phase 1 Concept Design

Functional requirement to concept - From the understanding of the project intent, clients expectation, preliminary review and inspection of the project site together with the initial architectural and interior drawings, we will conduct a feasibility study, select the best possible technological solution and will generate a concept proposal to be presented to the owner and project team. This will ensure the owner fully understands the design intention and the technology engaged meeting their needs.

We are involved in the initial space planning process to ensure all the required control/equipment rooms and installation space requirements are allowed for during this stage of development.

An estimated budget of the system will be indicated to the owner.


Phase 2 Design Development

Realization of the concept - The approved concept will be further developed with the assistance of specialized engineering softwares determining equipment locations, dimension, simulated results etc. Preliminary equipment layout, ceiling, sectional plans, suggested installation intention are generated.

The requirements are coordinated with the design team including space requirement, locations, power requirement, heat dissipation ventilation, structural loading etc. Revisions are made until we reach the final design which are fully coordinated with the team.


Phase 3 Tender Documentation

In this stage tender document will be generated with the inclusion of :
a. Equipment schedule
b. Technical specification
c. Brands recommendation
d. Tender drawings

A list of tenderers based on their merits and experience is submitted to the owner for tendering purpose. We will assist the owner evaluating the tender returns and make recommendation for the award.


Phase 4 Construction Supervision

Submission & Approval - Prior to the construction works and equipment procurement, we are responsible for approving the contractor’s material and drawing submissions.

Supervision - We will monitor the progress of the installation works and will make periodical site check on the quality of works by the contractor as to ensure it conforms to the design intent and achieve the best installation quality.


Phase 5 Testing & Commissioning

Acceptance test - We shall conduct and witness the system check from installation quality, functional and performance test as conducted by the contractor. Utilizing professional test instruments for measurement and generate datas for comparison and system calibration.

The system test will be concluded by a report which indicates the non-conformance items and rectification recommendation.